Introduction
The publication of the standard ISO 17799 provides an international basis for a common understanding of management of information security. ISO 17799 was developed as a standard containing codes of practice for information security management to ensure that appropriate action is taken to secure data storage and transfer - whether data is provided in paper or in electronic form.- Security Policy
- Security Organisation
- Asset Classification and Control
- Personnel Security
- Physical and Environmental Security
- Communications and Operations Management
- Access Control
- Systems Development and Maintenance
- Business Continuity Management
- Compliance.
The Information Security Management System
Overview
The PCDA (Plan-Do-Check-Act) model used as basis for the revision of BS 7799-2 was not only selected to conform to other management standards such as ISO 9000 or ISO 14000. It even more emphasises a strict process thinking to use this model which has its root in quality management.The phases or activities of the PDCA cycle are:
- PLAN: Establishing the ISMS
- DO: Operating the ISMS
- CHECK: Monitoring and reviewing the ISMS
- ACT: Improving the ISMS.
PLAN
The PLAN phase is concerned with establishing the ISMS. The first step is to determine the scope of the ISMS, i.e. responding to what shall be controlled by the ISMS. An ISMS policy has to be defined that includes objectives, legal or regulatory requirements, contractual obligations, strategic organisational and risk management context and risk assessment criteria.This step identifies the assets becoming subject to risk assessment and threats to those assets. Further vulnerabilities that might be exploited by the threats and potential losses have to be identified.
Risk assessment means to look at typically two parameters: probability of occurrence of risk and impact in case of occurrence of risk.
The FMEA (Failure Mode and effects Analysis) provides a third very interesting parameter: the probability of detection. This is the probability that the occurrence of a threat is detected by using detection actions before any major impact has happened. An example for detection actions are virus scans or intrusion detection.
There are several options of how to respond to a risk, including:
- taking actions
- accepting risks
- avoiding risks
- transferring risks to other parties.
ISO 17799 includes several controls without claiming these to be complete. These controls shall be selected and justified on basis of the results of risk assessment.
The Statement of Applicability documents the controls.
Management has to approve the implementation of the ISMS. The responsibility of management is a key success factor for the ISMS (please cf. below).
DO
The DO phase implements the steps as planned in the previous phase. Activities as known from project management are employed to build the ISMS. These include:- Management of implementation
- Resource Management
- Schedule Management
- Training Management
CHECK
In the CHECK phase the ISMS is monitored and reviewed.Monitoring the operation of the ISMS includes detecting errors in the results of processing, identifying security breaches, auditing performance, identifying actions taken to resolve a security breach, following up actions in case of security breaches.
Reviews ensure the effectiveness of the ISMS; they are conducted in a regular manner. Reviews include:
- Security Policy and Objectives
- Audits
- Observations
- Suggestions for Improvement
- Feedback.
Residual and acceptable risk has to be reviewed regularly with regard to impact on organisation, technology, business objectives and processes, identified threats and external effects such as legal or regulatory environment and changes in social climate.
ACT
The ACT phase is the phase of improvement. In this phase improvements are implemented, corrective and preventive actions taken, results communicated with all interested parties and improvement actions monitored.The Management Control System
The management control system comprises:- Document Control
- Audit
- Review
- Responsibility of Management
- Corrective and Preventive Actions
- Continual Improvement
Document Control
Document Control of ISMS is the same as of quality management. Hence, all organisations having implemented a document control system conforming to ISO 9000: 2000 will meet the requirements of BS 7799-2 with regard to the procedures needed for document control. The single steps are:- Approval of documents for adequacy prior to issue
- Review and update of documents as necessary and reapprove
- Identification of changes and current document revision status
- Availability of relevant versions of documents at points of use
- Legible and readily identifiable documents
- Identification and controlled distribution of external documents
- Controlled distribution of documents
- Prevention of unintended use of obsolete documents
- Suitable identification to obsolete documents if they are retained.
- Statements of security policy and control objectives
- Scope, procedures and controls of the ISMS
- Risk assessment report
- Risk treatment plan
- Procedures to ensure effective planning, operation and control of its IS processes
- Records (cf. below)
- Statement of Applicability
Records have to be made and maintained as evidence of conformance to the standard and to demonstrate the effective operation of the ISMS. Again, the requirements are the same as for quality management.
- Identification
- Storage
- Protection
- Retrieval
- Retention
- Disposition
The internal Audit
The internal audit plays a core role in the effort of maintaining information security and improvement. Audits shall ensure that all elements of the ISMS conform to the requirements of the standard and identified information security requirements, are effectively implemented and maintained and perform as expected. The results of audits are:- Actual, detected concerns (cf. below: Corrective Actions)
- Potential concerns (cf. below: Preventive Actions)
- Opportunities for improvement (cf. below: continual improvement)
- Definition of audit objectives
- Examine the documents
- Audit planning
- Auditing
- Audit results report
- Completion of audit plan
- Follow-up audits as needed
Organisations running a quality management system easily can combine the audit function of the ISMS with the one of quality management.
Management Review
Management has to conduct a management review of the ISMS; this again is known from quality management. The management review shall confirm the continuing suitability, adequacy and effectiveness of the ISMS.Management Responsibility
A very important, though often neglected element of the management control system is management responsibility. It covers three items:- Management commitment
- Resource management
- Training, awareness and competency.
Management commitment is like in other management systems a critical success factor. In particular, management has to care about:
- Establishing the information security policy
- Ensuring that information security objectives and plans are established
- Assigning roles and responsibilities
- Communication of importance of information security
- Providing sufficient resources for the ISMS (cf. below)
- Deciding about acceptable level of risk
- Conducting management reviews.
Management is responsible to provide sufficient resources to:
- Establish, implement, operate and maintain the ISMS
- Ensure that ISMS procedures support the business requirements
- Ensure that legal/regulatory requirements and contractual obligations are addressed
- Ensure adequate security by applying implemented controls
- Carry our reviews and taking appropriate actions
- Improve effectiveness of ISMS
Management is responsible that all personal of the ISMS is sufficiently trained. In detail:
- Determining necessary competency
- Providing training
- Evaluating effectiveness of training
- Maintaining training records on experience, skills and qualifications.
Corrective and Preventive Actions
Internal audits and other internal and external source provide evidence about the effectiveness of the ISMS. Actions are initiated to eliminate any concern and prevent the re-occurrence of such concern. With regard to the management system there are two important types of actions: corrective actions and preventive actions.Continual Improvement of the ISMS
Both ISO 9000:2000 and BS 7799-2 list next to the just mentioned corrective and preventive actions the continual improvement. Whereas corrective and preventive actions focus on detected or potential concerns actions also can be taken to further improve a system in terms of effectiveness and efficiency that is free of any concern.- Identification of possible improvement area s
- Analysis and justification of needed action
- Determining availability of resources
- Deciding to implement improvements
- Implementing improvements
- Measuring impact on organisation
- Considering results at management review
- Continually looking for improvements.
Conclusion
BS 7799-2 provides an information security management system to realise information security as determined in ISO 17799. The neighbourhood to ISO 9000 is obvious and an important issue to efficiently setup the system.By Andreas E. Fiedler
Published